Bridge washing operations will require lane restrictions over the next two weeks, beginning Monday evening, Oct. 14. The work will take place mostly overnight.
The locations affected are bridges along major thoroughfares, including Riverside Drive, Piedmont Drive, Central Boulevard and South Main Street. Slow down when approaching these areas and be alert to altered traffic patterns.
DBi Services from Hazelton, Pa., is the contractor. Crews will use a high-pressure wash truck and a sweeper.